PROMISE: Nuclear-powered Moon roverNASA announced on Saturday (Nov. 7) that it is moving forward with development of PROMISE (Polar Rover for Observation, Mapping, and In-Situ Exploration).
Carrying science instruments and technology demonstrations, the six-wheeled rover will land at the Moon's South Pole to characterize the surface and subsurface, assess resource potential and provide data to enable landing site selection, as well as future infrastructure and exploration activities. The nuclear-powered rover can operate during long lunar nights and within permanently shadowed regions thought to harbor ice, which is crucial for a sustained human presence on the Moon.

The agency's Jet Propulsion Laboratory (JPL) in Southern California, a division of Caltech, will manage the mission and build the rover from a combination of spare flight components and engineering test models for NASA's Curiosity and Perseverance Mars rovers. Using proven hardware, software, and Mars rover operation approaches significantly reduces cost and enables integration and testing of the complex PROMISE rover on a shorter timeline. NASA has assessed the compatibility of the hardware with the lunar environment and determined it can tolerate the harsh conditions found near the Moon's South Pole.
The PROMISE rover will carry a drill to extract regolith, or lunar dust, to characterize ice and other resources from approximately 3 feet (1 meter) below the surface, spectrometers for analyzing the chemical composition of surface material, temperature and radiation sensors, and visible-light cameras. It will demonstrate a next-generation, radiation-tolerant computing system, NASA's High Performance Spaceflight Computing, and advanced autonomy sensors and algorithms. NASA is targeting late 2028 to launch PROMISE and planning an 18-month mission for the rover.
NASA awarded Blue Origin a $94 million base contract, with an option period worth an additional $140 million based on performance to deliver PROMISE to the lunar South Pole. The award expands the task order awarded in May 2026 to deliver two lunar terrain vehicles to the Moon. Blue Origin will use its Mark 1 lander to deliver and deploy the rover as part of the Moon Base's first phase.