Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
[i]...but a delay is far from certain. Engineers said it may be possible to clear the lines for use as is, allowing Endeavour's crew to take off on time. If the lines can't be used, NASA could opt to launch the new module on time but delay its activation until new lines can be installed during a subsequent flight. Sources said senior managers have ruled out delaying Endeavour's launching until after a flight currently scheduled for mid March. ...NASA managers originally intended to attach Tranquility to Unity's Earth-facing port but later decided to mount it on the left side instead. Connectors needed to circulate ammonia coolant to and from Tranquility were not correctly positioned, or "clocked," for Tranquility to be attached to Unity's left-side port. As a result, custom hoses were ordered to compensate for the offset. During a ground test this week, a hose ruptured below the expected threshold. The failure occurred at a much higher than normal pressure, but engineers are looking into the issue to find out what might be needed to resolve the matter. Additional testing may show the hoses are acceptable for flight as is, a manager told CBS News. If not, engineers also are considering whether Tranquility can be launched on time, delaying its activation and connecting "keep-alive" power until new or redesigned hoses can be launched and installed during a later flight. Space station engineers and managers plan to discuss the issue in more detail Tuesday.[/i]
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.