Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
Reboost Oscillations Update: As structures specialists continue in-depth loads analysis of the 1/14 reboost anomaly, the call for the next reboost on 2/4 with the SM twin main engines is awaiting a Go/No-Go decision, to be made by the joint IMMT (ISS Mission Management Team) on Monday (2/2). [As of now, evaluation of the external video survey conducted over the last weekend and a review of subsystem data have not shown any off-nominal results.]
[i]The station was built with extra structural strength, [NASA spokesman Kelly] Humphries said, and the current analysis is "just making sure we haven't eaten into that margin."[/i]
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.