Space News
space history and artifacts articles

Messages
space history discussion forums

Sightings
worldwide astronaut appearances

Resources
selected space history documents

  collectSPACE: Messages
  Commercial Space - Military Space
  Orbital ATK Antares 230 (RD-181) hotfire test

Post New Topic  Post A Reply
profile | register | preferences | faq | search

next newest topic | next oldest topic
Author Topic:   Orbital ATK Antares 230 (RD-181) hotfire test
Robert Pearlman
Editor

Posts: 42988
From: Houston, TX
Registered: Nov 1999

posted 05-12-2016 06:29 PM     Click Here to See the Profile for Robert Pearlman   Click Here to Email Robert Pearlman     Edit/Delete Message   Reply w/Quote
Orbital ATK photo release
Antares First Stage Rolled Out for Test

Orbital ATK's Antares first stage with the new [RD-181] engines is rolled from the NASA Wallops Flight Facility's Horizontal Integration Facility to Virginia Space's Mid-Atlantic Regional Spaceport Pad-0A on May 12, 2016 in preparation for the upcoming stage test in the next few weeks.

The team will continue to work meticulously as they begin final integration and check outs on the pad and several readiness reviews prior to the test. The window for the stage test will be over multiple days to ensure technical and weather conditions are acceptable.

Robert Pearlman
Editor

Posts: 42988
From: Houston, TX
Registered: Nov 1999

posted 05-31-2016 06:05 PM     Click Here to See the Profile for Robert Pearlman   Click Here to Email Robert Pearlman     Edit/Delete Message   Reply w/Quote
Orbital ATK release
Orbital ATK Conducts Test of Antares First Stage

Initial Data Points to Successful "Hot Fire" of Upgraded First Stage and New Propulsion System

Company on Track for July Launch of OA-5 CRS Mission to the International Space Station from NASA's Wallops Flight Facility

Orbital ATK, a global leader in aerospace and defense technologies, today announced it conducted a full-power "hot fire" test of the upgraded first stage propulsion system of its Antares medium-class rocket using new RD-181 main engines. The 30-second test took place at 5:30 p.m. (EDT) on May 31 at Virginia Space's Mid-Atlantic Regional Spaceport (MARS) Pad 0A.

Initial indications are that the test was fully successful. The Antares engineering team will review test data over the next several days to confirm that all test parameters were met. Assuming the success of the test is confirmed, it will clear the way for the resumption of Orbital ATK's cargo logistics missions to the International Space Station (ISS) from Wallops Island, Virginia, currently scheduled for July.

"Early indications show the upgraded propulsion system, core stage and launch complex all worked together as planned," said Mike Pinkston, Orbital ATK General Manager and Vice President, Antares Program. "Congratulations to the combined NASA, Orbital ATK and Virginia Space team on what appears to be a successful test."

The primary goal of the test was to verify the functionality of the integrated first stage, including new engines, modified Stage 1 core, avionics, thrust vector control and pad fueling systems in an operational environment.

During the test, a number of operational milestones were met including full propellant loading sequence, launch countdown and engine ignition and shut down commands, as well as multiple throttle settings including full engine power. The test also validated the launch pad's operation, including propellant tanking and the use of the water deluge system to protect the pad from damage and for noise suppression.

Orbital ATK will now purge and clean the engines of residual propellants and return the first stage used in this test to the Horizontal Integration Facility for full reconditioning prior to its use on the OA-7 mission slated for later this year. The Orbital ATK team will continue to prepare the Antares rocket that will launch the OA-5 mission, which is in the final stages of integration, systems testing and check-out in preparation for launch this summer.

Each of the new flight RD-181 engines has undergone hot fire acceptance testing at the manufacturer's facility prior to being shipped to Orbital ATK. A certification test series was successfully completed in the spring of 2015 where a single engine was test fired seven times, accumulating 1,650 seconds of test time and replicating the Antares flight profile, before being disassembled for inspection.

"The successful stage test, along with the extensive testing of each new RD-181, gives us further confidence in the first stage propulsion and in moving forward to launch," said Pinkston. "We are now focused on the OA-5 mission and launching the enhanced Cygnus spacecraft to the International Space Station on our upgraded, higher-performing Antares rocket."

The enhanced Cygnus recently flew on the successful OA-4 and OA-6 missions, launched in December and March, respectively. The spacecraft has several new features, including larger cargo capacity, the use of Orbital ATK's lightweight UltraFlex solar arrays, a mass optimized service module structure and a lighter weight propulsion system. Cygnus, like most Orbital ATK spacecraft, is compatible with multiple launch vehicles, enabling the recent use of United Launch Alliance's Atlas V launch vehicle. The OA-5 mission will be the first Antares mission to launch the enhanced Cygnus.

Orbital ATK has successfully completed five cargo delivery missions to the ISS, including a demonstration mission in 2013 and four operational missions under the CRS-1 contract from 2014 to present. In total, the company has delivered 24,000 pounds (10,900 kilograms) of essential equipment and supplies in support of ISS crew and operations.

Under the CRS contract with NASA, Orbital ATK will deliver approximately 62,000 pounds (28,000 kilograms) of cargo to the ISS over 11 missions through 2018. The partnership is changing the way NASA does business, helping build a strong American commercial space industry and freeing the agency to focus on developing the next-generation rocket and spacecraft that will enable humans to travel farther in space than ever before. Orbital ATK is also on contract for six initial missions for the follow-on CRS-2 program.

All times are CT (US)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Us | The Source for Space History & Artifacts

Copyright 2020 collectSPACE.com All rights reserved.


Ultimate Bulletin Board 5.47a





advertisement