*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
[i][b]September 20 1967[/b] MSC proposed to the NASA Office of Manned Space Flight a sequence of missions leading to a lunar landing mission. The sequence included the following basic missions: [list=A][*]Saturn V/unmanned CSM development [*]Saturn IB/unmanned LM development [*]Saturn IB/manned CSM evaluation [*]Saturn V/manned CSM and LM development (A dual Saturn IB mission would be an alternative to the Saturn V for mission D) [*]CSM/LM operations in high earth orbit [*]Lunar orbit mission [*]Lunar landing mission (like Apollo 11) [*]Lunar landing mission (Apollo 12, 13, and 14) [*]Reserved for lunar survey missions (not used) [*]Lunar landing missions, upgraded hardware (Apollo 15, 16, and 17)[/list] Memos, George M. Low, ASPO Manager, to distr., "Mission development and planning," Sept. 25, 1967; Low to Director, MSC, "Meetings with General Phillips and Dr. Mueller," Sept. 9, 1967; ltr, Robert R. Gilruth, MSC, to George E. Mueller, NASA Hq., Sept. 19, 1967; telecon, Ivan D. Ertel to John Sevier, Feb. 26, 1975."[/i]
If you have previously registered, but forgotten your password, click here.
*** Click here to review this topic. ***
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.