Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
Athena is approximately halfway to the Moon and continues to communicate with our flight controllers in Houston. Our flight controllers are preparing for the mission's next milestones, Trajectory Correction Maneuvers (TCM). TCMs are intended to refine Athena's trajectory ahead of lunar orbit insertion.
Our flight controllers used the Company’s Lunar Data Network to command Athena's first planned Trajectory Correction maneuver (TCM) at 11:00 a.m. CT on February 28, 2025, to refine the lander's trajectory ahead of Lunar Orbit Insertion (LOI). Data from the 6-second full-thrust mainstage engine burn confirmed Athena hit her 9.5 m/s target with approximately .38 m/s accuracy. Propulsion mixture ratios, mass flow rate, and temperature were as predicted. The TCM was nominal per expectations. Athena continues to be in excellent health and is closer to the Moon now than the Earth.
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2025 collectSPACE. All rights reserved.