[b]Deployable tower assembly extended[/b] This afternoon (Dec. 29), the Webb team successfully extended the observatory’s Deployable Tower Assembly (DTA), creating critical distance between the two halves of the spacecraft. The DTA extended about 48 inches (1.22 meters), putting room between the upper section of the observatory, which houses the mirrors and scientific instruments, and the spacecraft bus, which holds the electronics and propulsion systems. This creates enough distance to allow the sensitive mirrors and instruments to cool down to the necessary temperatures to detect infrared light. This gap will also provide room for the sunshield membranes to fully unfold. The deployment took more than six and a half hours, as engineers activated release devices and configured heaters, software, and electronics, before commanding the DTA itself to extend. The movement of the DTA, which looks like a large, black pipe, is driven by a motor. The team began the deployment at approximately 9:45 a.m. EST and completed it at approximately 4:24 p.m. EST.
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.