Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
[i]Boeing and ULA designed the metal latticework structure to be modular such that large sections of the tower will be constructed away from the pad and then trucked in and stacked, allowing assembly to be completed between on-going Atlas V unmanned launches. It is expected to take about 18 months to erect the structure.[/i]
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.